← Plugin catalog

CLAUDE SETUP

Connect a tool to Claude.

Choose a tool, add its MCP endpoint as a custom connector, then try a small request.

01 / CHOOSE THE TOOL

Find added, removed, and changed rows across two spreadsheets. Download the change list.

AuthenticationNo sign in

Anonymous server initialization and tool discovery checked on 11 October 2026. This does not certify installation in the host.

Read the tool details ↗

Endpoint access and host installation are separate checks. Start with made-up data and review the output.

02 / CONNECT IN CLAUDE

  1. Open the connector settings.

    In Claude, open Customize, then Connectors. Choose the option to add a custom connector. A workspace owner may need to configure it for a team.

  2. Add the tool endpoint.

    Use the tool name and the endpoint shown here. Review the detected authentication. These checked endpoints require no sign-in. Choose No sign in, then add the connector.

  3. Enable it for your conversation.

    Open a new chat and check that the connector is available and enabled. Workspace settings and account access can affect this step.

  4. Try one clear request.

    Paste the sample prompt. Check which inputs the tool accepts. A file in the chat is not automatically available to every connector. Review the returned result.

Open Claude

You complete these steps in your own account. ToolRoutine does not sign in, install, or submit a connection for you.

IF THE CONNECTION DOES NOT WORK

Check the right thing first.

The option is missing.

Check your account's access and administrator settings. Follow the linked host instructions for your current interface.

The endpoint cannot connect.

Copy the full HTTPS endpoint, including /mcp. Check authentication and the remote service's status. A public URL must be reachable from the host.

A file does not reach the tool.

Check the tool's accepted input format and the host's file permissions. Use a supported data path. Do not assume a chat attachment is forwarded.

For a setup question, email support@zovo.one with the tool name, host, and a made-up example.